I then installed the standpipe.
The other major item was installing the source line wiring. 2 gauge wire is really obnoxious, but it is in.
These weren't made for 2 gauge, but they held. They were the only clips I had that were even remotely close to large enough.
I should have plenty of slack.
The inside is all buttoned up.
I don't have quite as much as outside, but should be plenty.
It is all sealed up.
I also started to go around and chop off the excess foam.
At that point, I was running out of materials, so I went home, grabbed some grub, and went up to Home Depot. I decided to go with the underlay as my paneling with a bleached stain. I only got three cans which was all they had, so I will have to finish it after it is installed.
I put a blanket on it to help protect it from the dew.
Matt is coming up tomorrow, so hopefully all this will be installed tomorrow.
No comments:
Post a Comment