Monday, September 24, 2018

Paneling day.

I took a half day at work today.  Today's septic update: more sand.

Did the front of the walls.

I started working on the bathroom.  One thing I didn't consider is that this almost didn't fit through the door.  It is a good thing for me that the paneling is really flexible and I was able to contort it enough to get it in the room.  

Now that the room is closed in, there is quite the difference between it with the light on and off.


For some reason I only bought enough paneling to do one side of each wall.  Not sure what happened there.

I should probably post this with every update.

Before Occupancy:

  1. Install paneling on interior walls.
  2. Build floor pan for the bathroom
  3. Install bathroom fixtures.
  4. Install exterior electric boxes.
  5. Complete interior plumbing and test it.
  6. Finish running the waste PVC line.
  7. Run water lines for well.  
  8. Get well installed.
  9. Get hot water heater installed.
  10. Install flooring.
  11. Install some form of cabinets in the kitchen.  
  12. Install kitchen sink.
  13. Install kitchen appliances.
  14. Install enough driveway to satisfy the apron requirements.


Before Winter:
  1. Build bed frame.
  2. Build closets.
  3. Install table.
  4. Install skirting.
  5. Install heat tapes.
  6. Build some sort of porch.
  7. Smooth driveway enough to plow/clear
  8. Fix snowblower.  
  9. Winterize equipment (mower, undercoat the truck, etc).
  10. Clear slab
  11. Shed work
    1. Extend roof to prevent snow pushing on the side.
    2. Fix pilings.

No comments: