Even though I didn't get out of work until well after 6 today, it was such a nice day that I decided to go up anyways. It was in the 60s when I got up there, and clear with a slight breeze. Unfortunately I am presenting at the demo again, so I will only be taking a half day off again. Given how late I have stayed the last couple of days, I won't need to use vacation for it though.
Unfortunately the only picture I took of it was just a blur, but I finished the plumbing vent. The plumbing is now complete. The only thing I need to check before installing the insulation there is the bathroom vent. I had considered installing a wall vent, but haven't really looked into them. If I do a ceiling vent, that will have to be done before the insulation is installed.
I also put the wire in. I haven't run it or anything.
Didn't get a chance to run it up the wall, it was well after 7 by this point and starting to get hard to see.
As I mentioned, I am taking a half day tomorrow, so I should hopefully get the panel installed tomorrow.