I completed one of the walls, making the other shorter piece that attaches to the longer one. Unfortunately it appears I miscounted, and don't have enough studs to finish the other wall (I am two short).
I also prepped the site for rain. Unfortunately there is nothing to prevent it from pooling in between the studs, but there isn't much I can do about it. The tarps aren't wide enough to put a drum on it and make a taper, they don't actually cover all the wood as it is.
I ended up using the two large tarps I bought for the garage, so all I managed for that was to move everything toward the center, and I did tarp the generator and miter saw.
No comments:
Post a Comment