I have gotten a couple of things done in the evenings though. I got the futon and dresser swapped.
I also got the felt pads put on the wire rack in the bathroom. They didn't seem to stick that well, we will see how well they stay on.
When I have had daylight, I have been working on the carport. I finished getting the bottom plates reattached yesterday.
I finished it up after dark (the carport has a beefy light in it thankfully), but I also installed some extra bracing. The repair isn't as strong as the original install, so am trying to help make up for that, since I do still need to drag the carport another few feet over. I have a couple more braces to install; I also got some T braces for the joints in addition to the ones in the picture.
As the carport nears completion, I went and poked my head in the new quarry that recently opened on 9. I couldn't find an office or anything up there though. There was one guy in a loader in the back and that was it. I didn't even see a scale, which I thought was odd. So I think for now I will stick with Cold River materials. I plan on getting the stone I need for the drainage set up today, and hopefully they can get it up there either today or tomorrow (assuming they haven't switched to their winter hours yet). I still have some digging to do and all that if they can't deliver it until Monday though. I also took a water sample and will be stopping at the hot tub place today since I can't figure out what I did wrong with the chemicals. I figured I would see what they have to say before going the nuclear route (basically pour a quart of bleach in it, run it for a day, then drain it and start over).
Current To-do:
- Before winter:
Move carport- Fix carport
- Final grade - get gravel and drainage pipe.
Buy a real bed and living room furniture.Get a gun cabinet/safe.- Fix driveway.
- Install drainage in the backyard. Remove the backflush hose.
Get heat pump installed.- Get a snowblower for the tractor.
Build a platform for the steps.- Insulate the water lines
- Winter projects:
- All the cabinet upgrades (bathroom, pantry, and kitchen)
- Design deck
- Build armoire
Build dresser- Shelving upgrades in master closet.
- Access panel upgrades in master closet
- 2024 Projects:
- Deck
- Entertainment center
- Storm doors