Sunday, April 10, 2016

A little more progress

I slept in a bit today and got a late start, but managed to put up the last of the joists for the loft.


I also got the plywood required for the flooring.


Unfortunately the generator ran out of gas, but everything is set up for the next step.  I have all the measurements I need for supports, and once those are in place then I can nail down the flooring.




I put the tarp back up as it was before, but made an amendment so that it has a spot to run off out of the shed.

4 comments: