As an amusing side note about the Colorado trip; when I got back I had an email from a head hunter about a job in Colorado Springs. I have poked around the area a bit (houses are ridiculously expensive...), but am reluctant to do that drastic a relocation at this point in the Sullivan project. It would be one thing to move somewhere I can still drive here and maintain the place until it is ready to sell, but Colorado is a 30 hour drive if I go straight there. It is two 18 hour drives if I stop over in KY.
No progress on the checklist. Aside from Ida, the weather has been really nice this week, and I have a three day weekend coming up (though Labor day doesn't look nice). Given that it is September and I already have a couple of weekends booked, I really ought to start cracking on the project work before winter. There aren't many weekends left.
2021 Projects:
- Shed supports
Table- South wall siding
- Review options for house (mobile home vs stick built vs modular)
- Level back yard
- Level front yard
- Remove dead/dying beech trees
- Eliminate pile of crap in back
- Camper Power Center (portable AC power source and generator)
- Baffle box
- Driveway round three
- Fix shed floor.
No comments:
Post a Comment