Sunday I managed to drag myself out to do my typical weed killing. It turns out that despite the rain on Saturday, my creek is mostly dried out.
I also did something that was about 5 years overdue, I found my paint scraper and scraped all the stickers off the doors and windows.
I also got tired of knocking the beginnings of a nest out of here every day, so I put up a block to make them look elsewhere.
While I wasn't terribly motivated, I did finish up the first half of the shed floor. I just need to empty out the other half and get that done now. It is nice and solid again.
While I was up there, I measured the door frame to look at what it would cost to get doors for it. It turns out my doorway was a very standard double door size (72x80). I poked around, but given how expensive double doors are, I might just reskin the frames I already have though.
Here are some turkeys.
I have a bunch of stuff to do during the week this week: deliver the trailer, there is a planning board meeting about another lot subdivision, run to the dump, bring my truck in (I had another TPMS sensor fail on the Tundra), and stuff like that, so I might not post anything this week.
While I made good progress on the floor, it is still only half done. I have looked at though not really started the doors, so I am not marking them in progress yet.
Summer projects:
Prep truck for trade in- Determine house plans (modular vs mobile vs stick)
- Get my power service upgraded
- Shed floor
- Shed doors
- Concrete shed supports
- Anti-mouse the shed (seal it, maybe spray with pepper spray or something)
- Eliminate pile of crap in the back yard.
- Level the yard.
- Investigate retaining wall construction.
- Install windows in the shed.
Fix/sell the utility trailer.- Driveway round 5
- Get building permit
- Determine the future method of travel. Build prototype?
- Come up with garage plans
- Clear walking trails on lot.
- Build a bridge over the creek
No comments:
Post a Comment