I also went and measured my wires, I have plenty of spare wire. I measured 5' of leftover, which explains why I was a cable short; there should have only been 3. This is unfortunate, since 3' was the amount that I needed. I will need to stop by someone's house and get it cut, and then I can crimp it. It does unfortunately mean that I won't get it completed this weekend. Even if I stop by Barry's or Tim's and get it cut, I won't have access to the press at work for crimping until Monday.
With the power center on hold until I get everything crimped, I will have to decide what I want to do this weekend. It looks like a hot one, but at least Saturday will be dry. Perhaps I will go fetch the rest of Greg's rocks and start working on that. I might start on one of the shed items too, nail in the side that isn't coming apart properly so I can move all the tools that are falling onto the ground to that side. That said, no progress yet on the projects.
2021 Projects:
- Shed supports
Table- South wall siding
- Review options for house (mobile home vs stick built vs modular)
- Level back yard
- Level front yard
- Remove dead/dying beech trees
- Eliminate pile of crap in back
- Camper Power Center (portable AC power source and generator)
- Baffle box
- Driveway round three
- Fix shed floor.
No comments:
Post a Comment