I started listing out the tasks I will need to complete and when they are needed by; basically developing the plan for next year for the building permit application. I made it as a separate tab on the building costs spreadsheet which can be found here: https://docs.google.com/spreadsheets/d/1of4w616ubED7IKwuVprNup7BjnlXKA95wPjGLvukh84/edit?usp=sharing
Here is what I have so far.
It looks like winter is coming this week, despite being 70 over the weekend. We are supposed to get a winter storm on Wednesday. All things considered, this is pretty late for a first snowfall. I can get the generator done whenever though. The knotweed kind of requires daylight, so I can't do that during the week. I will be leaving for Kentucky this weekend, so there might not be another post before Thanksgiving. The detailed house plans are now in progress though.
Before winter:
Deal with town and get the variance.- Knock down the dead knotweed.
- Winterize equipment. Fire up the generator
- Get the building permit.
- Complete detailed house plans.
- Work with La Valley to get a concrete contractor. Get the plan/schedule in place.
- Design future method of travel. Consider building the prototype.
- Shed floor.
- Shed windows.
- Fix generator box. Decide/do something about power center.
- Clear/mark walking trails.