
I also stopped by the quarry to pick up the gravel to finish the drainage ditch, but apparently they are off their summer hours and weren't open. Looking at the drainage ditch though, I am still thinking about running the pipe all the way down to the creek though. We have gotten a lot of rain the past week, and the part I never filled in was full. There was still active draining going on too. I could see water draining out of the pipe and running in.

So instead I got some other winterization stuff done. I got the hose taken off and drained. I also got the spicket drained.

The hose itself is now drained (it is easy when you live on a hill) and wound up.

No comments:
Post a Comment