The rest of the results were the same as before.
The wall cabinets are now complete.
I finally got this one placed.
I can finally unload my dishwasher for the first time in 4 months.
A quick video version
The countertops aren't fastened and cut yet, but I did pick up a new plywood blade so I can get that cut this afternoon or tomorrow. I am visiting Tim tonight to drop off his hand truck, so I might not get to it tonight. No movement on the checklist
- Install bathroom fixtures.
- Get hot water heater installed.
- Install some form of cabinets in the kitchen.
- Install kitchen sink.
- Install kitchen appliances.
- Get propane installed.
Build bed frame.- Build closets.
- Install table.
- Smooth driveway enough to plow/clear
- Fix snowblower.
- Winterize equipment (mower, undercoat the truck, etc).
- Clear slab
- Shed work
- Extend roof to prevent snow pushing on the side.
- Fix pilings
No comments:
Post a Comment