I did manage to get the platform attached.
The bed is now off the floor. Unfortunately, the u-bolt I bought was too short, so it is just tied off directly at the moment. It is very heavy, but I think I can manage it just fine. The cleat didn't tear out of the wall, so it is fine. Maybe someday I will rebuilt it a little thinner, but that is very low priority.
I also did a bunch of cleaning and whatnot. The place is a lot more open with the bed off the floor.
Today I did a little bit more cleaning and stuff, but did get everything cut.
I have everything cut for the other part of the bed. I might be able to sleep on my bed tonight.
The water blocks for the bathroom. This will allow me to finish sealing the floor.
I also have everything cut for the other set of shelves. Due to an unfortunate equipment failure, it isn't installed.
I also have the supports for the bathroom sink shelf cut.
I did have a few casualties as well this weekend. My pilot bit.
My air hose died as well. I think I have another one, I just need to find it.
No real movement on the checklist. Hopefully I get out of the gym early enough to finish the bed frame and sleep in my bed tonight.
- Install bathroom fixtures.
- Get hot water heater installed.
- Install some form of cabinets in the kitchen.
- Install kitchen sink.
- Install kitchen appliances.
- Get propane installed.
- Build bed frame.
- Build closets.
- Install table.
- Smooth driveway enough to plow/clear
- Fix snowblower.
- Winterize equipment (mower, undercoat the truck, etc).
- Clear slab
- Shed work
- Extend roof to prevent snow pushing on the side.
- Fix pilings
ruht roh too many equipment malfunctions . . .