Friday, November 9, 2018

Gipped.

Last night I went and picked up some lumber for the porch and the fixtures for the bathroom. 




I went to install the toilet tonight, and it appears that I got gipped.  The two screws that attach to the base are missing.  So no toilet tonight.


I wouldn't have been able to finish it anyways, it looks like this is not a standard connection.


Ugh, so no movement on the checklist.  Tomorrow hopes to be nice. 
Before Occupancy:
  1. Install paneling on interior walls.
  2. Build floor pan for the bathroom
  3. Install bathroom fixtures.
  4. Install electric.
  5. Complete interior plumbing and test it.
  6. Finish running the waste PVC line.
  7. Well prep work.
  8. Get well installed.
  9. Get hot water heater installed.
  10. Install flooring.
  11. Install skirting.
  12. Install some form of cabinets in the kitchen.
  13. Install kitchen sink.
  14. Install kitchen appliances.
  15. Install enough driveway to satisfy the apron requirements.
  16. Get propane installed.
Before Winter:
  1. Build bed frame.
  2. Build closets.
  3. Install table.
  4. Install heat tapes.
  5. Build some sort of porch.
  6. Smooth driveway enough to plow/clear
  7. Fix snowblower.  
  8. Winterize equipment (mower, undercoat the truck, etc).
  9. Clear slab
  10. Shed work
    1. Extend roof to prevent snow pushing on the side.
    2. Fix pilings

No comments:

Post a Comment